NextGenEnergyJobs.com

Remote, Taiwan

Remote

Clean Transportation

Installation & Construction

17 days ago

$0 - $0

About GE Vestas

We are passionate about creating an inclusive work environment. By valuing the ideas and contributions of a diverse workforce we help inspire others to grow, succeed, and raise the bar for everyone. Join us at GE Gas Power, where results can be achieved by embracing a community of belonging.

About the Role

Working within the Commissioning & Construction (C&C) organization, reporting to the C&C Regional Manager and the Site Manager / Overall Construction Manager, the piping supervisor is in charge of the BOP(Balance of Plant)-OFF BASE piping system pre-fabrication & installation for all the system feeding the Gas-Turbine/Generator shaft line equipment & associated auxiliaries in open & combined cycle plant configuration for extended scope.

Responsibilities

  • Site activities related to Piping installation of equipment and plant scope.
  • May lead others directly or indirectly and/or sponsor subcontractors.
  • Developing in-depth knowledge of a technical discipline.
  • Uses prior experience and acquired technical expertise to execute policy/strategy.
  • In-depth understanding of key business drivers; uses this understanding to accomplish own work.
  • Uses some level of judgment and has ability to propose different solutions outside of set parameters but with guidance.
  • Perform detailed material inventory of GE supplied material.
  • Collect material certificate of all piping components.
  • Review welding documents WPS, welder qualification before welding activities start.
  • Ensure PED compliance with SQS for all welding, NDT documents.
  • Report cost of non-quality with GE tools: Service-Now, Engineering Request.
  • Perform final inspection of all systems.
  • Document quality plan & inspection sheets timely and follow up red marked-up documentation.
  • Attend systems walk down for turn over to commissioning, follow up punch list item resolution.
  • Document means (personnel man-hours per discipline, cranes, scaffolding) utilized during installation for future budget purpose.
  • Document cost of non-quality.
  • Issue progress report to the Construction manager or Site Manager and TK/SI Installation Leader.
  • Issue end of assignment report and edit Lessons Learned.

Requirements

  • electrical
  • detailed
  • wps
  • piping
  • departmental operations
  • commissioning
  • installation
  • welding
  • mandarin
  • tk
  • ability to communicate
  • site installation
  • electrical construction
  • chinese
  • judgment
  • project management

Benefits